  • Start up, normal operation, normal shutdown and emergency shutdown sequence for the turbocompressor of Lamargas T-101

  • Operational and control sequence for the Plastilago Hydrogen Plant

  • Hazard analysis and emergency shut down sequence of refrigeration compressor of a liquid extraction plant

  • Start up sequence and flame safeguard of boilers: 9,10,11 y 12

  • Isobutane storage control sequence in the S-505 tank

  • Steam Distribution Network Simulation for Maraven’s Cardón Refinery

  • Instrumentation and Control Detailed Engineering for a Water Treatment Plant

  • Design, Configuration, loading. documentation, commissioning, start up, tuning of antisurge control algorithms

  • Superheated boiler simulation for training purposes

  • Design, Configuration, Loading, documentation, commissioning, start up and tuning of basic and advanced control strategies for four superheated boilers