Control System Replacement, MPLL-5 Gas Turbocharger
SCOPE: Purchase of Signal Conditioner Modules for Fisher-Parker Control Valve Actuator and PLC Interface. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2012. INDUSTRY: Oil & Gas
Productos relacionados
-
SCOPE: Parts Supply (Power distribution module). CLIENT: Fertinitro. LOCATION: Venezuela. DATE: 2015. INDUSTRY: Oil & Gas
-
SCOPE: Supply and assembly of 3 control systems based on AB PLC. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2006. INDUSTRY: Oil & Gas
-
SCOPE: Installation of field instruments, PLCs, RTUs, Power System, Communication System & integration to the SCADA System. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2005. INDUSTRY: Oil & Gas (Crude Production)
-
SCOPE: Engineering, Procurement, Construction, Applications & Integration SCADA system & MOD300. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2001. INDUSTRY: Oil & Gas
