Control Packaged ESD / PCS / F&G Systems. Rucio Viejo Plant
SCOPE: Update of Control System, ESD System, F&G System, configuration, programming & commissioning. CLIENT: Total Oil and Gas Venezuela. LOCATION: Venezuela. DATE: 2003. INDUSTRY: Oil & Gas
Productos relacionados
-
SCOPE: Engineering, Supply & Implementation of TMC Sentinel applications, Sequence Control System, ESD System, F&G Detection, Startup. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2013. INDUSTRY: Oil & Gas
-
SCOPE: Design Review and Validation. CLIENT: Rockwell Automation. LOCATION: Venezuela. DATE: 2011. INDUSTRY: Oil & Gas
-
SCOPE: Validation of Design Safety Instrumented System (SIS) & Training in Functional Safety in Processes. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2008. INDUSTRY: Oil & Gas
-
SCOPE: Engineering, Procurement, Construction, Commissioning & Startup of ESD System of Gas Compressor & Recovery Train. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2008. INDUSTRY: Oil & Gas (Refination)