Acogas RTU 2 Pressurization
SCOPE: Engineering, Procurement, Construction & Startup of a Slug catcher & Integration into the Existing Control System. CLIENT: Total Oil and Gas Venezuela. LOCATION: Venezuela. DATE: 2000. INDUSTRY: Oil & Gas
Productos relacionados
-
SCOPE: Technical assistance for Emergency Shutdown System HIMA. CLIENT: HIMA Americas. LOCATION: Chile. DATE: 2010. INDUSTRY: Oil & Gas
-
SCOPE: Engineering, Procurement, Construction & Commissioning of the SIS. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2008. INDUSTRY: Oil & Gas
-
SCOPE: Turbo-generator control system, governor control, load control, field instrumentation, Commissioning & Startup. CLIENT: Putranata. LOCATION: Indonesia. DATE: 2005. INDUSTRY: Electric
-
SCOPE: Engineering, Applications, Procurement Support, Construction & Commissioning of the ESD Systems. CLIENT: SINCOR. LOCATION: Venezuela. DATE: 2003. INDUSTRY: Refination