BMS Upgrade Hot Oil Heater, Lanxess Perth Amboy Plant
SCOPE: SIL-LOPA, SRS, SIL Verification studies, NFPA 87 GAP Analysis, BMS Architecture, final I/O and Cause & Effect matrix update (Remote Sessions – On Line). CLIENT: HIMA Americas. LOCATION: USA. DATE: 2023. INDUSTRY: Petrochemical
Productos relacionados
-
SCOPE: Consequences Analysis (EAC) & Quantitative Risk Study (ECR). CLIENT: Tecnicas Reunidas Chile Ltd. LOCATION: Bolivia. DATE: 2018. INDUSTRY: Oil & Gas
-
SCOPE: Effectiveness study and Fire & Gas detection systems coverage. CLIENT: TGI S.A. LOCATION: Colombia. DATE: 2016. INDUSTRY: Fire & Gas
-
SCOPE: Risk analysis and Hazardous Area Classification Study. CLIENT: Abeinsa EPC. LOCATION: España. DATE: 2016. INDUSTRY: Solar Energy
-
SCOPE: Validation of study HAZOP and Studies Consequence Analysis & LOPA. CLIENT: PEMEX. LOCATION: Mexico. DATE: 2016. INDUSTRY: Oil & Gas