Replacement of Control System. Compression Plants CL1, LG1 & LG4
SCOPE: Engineering, Supply & Implementation of TMC Sentinel applications, Sequence Control System, ESD System, F&G Detection, Startup. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2013. INDUSTRY: Oil & Gas
Productos relacionados
-
SCOPE: Engineering, Procurement, Installation & Startup of the SIS of the Plant. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2007. INDUSTRY: Oil & Gas
-
SCOPE: PLC Replacement, Integration & update of the new Field instrumentation. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2007. INDUSTRY: Oil & Gas
-
SCOPE: Engineering, Procurement, Construction, Integration & Startup to the telemetry system. CLIENT: Total Oil and Gas Venezuela. LOCATION: Venezuela. DATE: 2003. INDUSTRY: Oil & Gas
-
SCOPE: Update of Control System, ESD System, F&G System, configuration, programming & commissioning. CLIENT: Total Oil and Gas Venezuela. LOCATION: Venezuela. DATE: 2003. INDUSTRY: Oil & Gas