RVP Optimization Project
SCOPE: Engineering, Procurement, Construction & Startup for the installation of a backup system for RTU 1 in EPJ. CLIENT: Total Oil and Gas Venezuela. LOCATION: Venezuela. DATE: 2002. INDUSTRY: Oil & Gas
Productos relacionados
-
SCOPE: Engineering, Procurement, Construction, Commissioning & Startup of the Control System. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2009. INDUSTRY: Oil & Gas (Refination)
-
SCOPE: Supply and assembly of 3 control systems based on AB PLC. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2006. INDUSTRY: Oil & Gas
-
SCOPE: Engineering, Procurement & Assembly of the control cabinet of a flow station. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2002. INDUSTRY: Oil & Gas (Crude Production)
-
SCOPE: Programming, Configuration of Control & Commissioning System for integration into the SCADA system. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2000. INDUSTRY: Oil & Gas