Plants AV-2 and CD-4 Reinstrumentation, Cardon Refinery
SCOPE: Design & Specification of the Control System extension, ESD Specification & SIL Study. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2001. INDUSTRY: Oil & Gas (Refination)
Productos relacionados
-
SCOPE: Engineering, Supply & Implementation of TMC Sentinel applications, Sequence Control System, ESD System, F&G Detection, Startup. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2013. INDUSTRY: Oil & Gas
-
SCOPE: Engineering, Supply & Implementation of TMC Sentinel applications & Startup of Control Systems, Protection & Detection of F&G. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2013. INDUSTRY: Oil & Gas (offshore)
-
SCOPE: Consequence Analysis & System Engineering for CO2 Detection. CLIENT: Cerveceria POLAR, C.A. LOCATION: Venezuela. DATE: 2011. INDUSTRY: Food & Beverages
-
SCOPE: Engineering, Procurement, Construction, Configuration of SCADA Applications, Commissioning & Startup. CLIENT: PETROBRAS. LOCATION: Venezuela. DATE: 2003. INDUSTRY: Refination