Trip Analysis and Training – Boiler 6 – Lanxess Perth Amboy
SCOPE: Analyze the trends related to high pressure trip, Analyze the PLC program and the control loop strategy, Perform a simulation. Training. CLIENT: HIMA Americas. LOCATION: USA. DATE: 2023. INDUSTRY: Petrochemical
Productos relacionados
-
SCOPE: Design Review and Validation. CLIENT: Rockwell Automation. LOCATION: Venezuela. DATE: 2011. INDUSTRY: Oil & Gas
-
SCOPE: PLC Replacement, Integration & update of the new Field instrumentation. CLIENT: PDVSA. LOCATION: Venezuela. DATE: 2007. INDUSTRY: Oil & Gas
-
SCOPE: Engineering, Procurement, Construction, Configuration of SCADA Applications, Commissioning & Startup. CLIENT: PETROBRAS. LOCATION: Venezuela. DATE: 2003. INDUSTRY: Refination
-
SCOPE: Engineering, Applications, Technical Support & Testing of the Protection System based on a safety PLC. CLIENT: PETROCANADA. LOCATION: Canada. DATE: 2001. INDUSTRY: Oil & Gas